Crushing & Chipping

Crushing and chipping prepare incoming material for the stages that follow. Logs, slabs and branches may require chipping before further grinding, while material that is already suitably reduced needs a different review. Selecting this front end means considering the incoming size and condition, the required prepared material, feeding arrangement and downstream process together. This section provides separate drum-chipper and disc-chipper guides so you can compare their roles without treating them as interchangeable machines. Read the guide that best matches your incoming wood, then check the related chipping and grinding equipment. For a recommendation, provide representative material photos, maximum dimensions, the required output, operating schedule and the equipment already installed. Model-specific feeding limits, knife settings and maintenance instructions remain part of the selected machine's documentation.

Choose Your Reading Direction

  • Should the incoming wood be reviewed for a drum or disc chipper?
  • How should chip preparation match the next grinding stage?
  • What material and site information is needed before selection?

Technical Guides

Drum Chipper Buying Guide for Wood Chip Preparation

Review drum-chipper operation, incoming wood size, feeding requirements and interfaces with grinding and drying stages.

Read the guide

Disc Chipper Guide for Wood Chips and Pellet Lines

Compare disc and drum chipper applications, chip-quality factors and the information needed to match chipping with downstream equipment.

Read the guide

Drum Chippers

Review industrial wood chipping equipment for the incoming material and preparation route.

View equipment

Hammer Mills

Review wood and biomass grinding equipment for downstream material preparation.

View equipment

Request a Recommendation for Crushing & Chipping

Send the information below so TCPEL can review the relevant equipment and project scope.

  • Raw material photos and maximum size
  • Required prepared-material condition
  • Required output and operating schedule
  • Existing downstream equipment and site power supply

Return to the TCPEL Technical Knowledge Center